R. Rockefeller S.C.R. ROCKEFELLER S.C.EGYPT BRANCH HOMEAll locations
🇪🇬

INDEPENDENT BRANCH HOME / EG · AFRICA

Engineering presence active · commercial branch in preparation

Egypt

Egypt connects the Group’s North African network with industrial transformation, engineering, sustainability, HSSEQ and intelligent operations.

BOARD & INDIVIDUAL RESPONSIBILITIES

Egypt: published people and responsibilities.

Every available first-party portrait is connected directly to the person, role and matching professional resource.
Official portrait not published
EG / BOARD

Dr. Yahia Zakaria Aly Moustafa

General Director, Egypt Engineering Center

Official portrait not published
EG / BOARD

Mohamed Lassaad Kedimi

North Africa coordination

LOCAL MANDATE & SECTORS

A country-specific mission inside the global platform.

The active New Cairo center provides technical capacity while the separate country branch continues through its formation process.

OFFICIAL PHOTOGRAPHIC RECORD

Egypt: the complete visual story.

The remaining offices, institutional encounters, projects and local activity are collected once in a single ordered gallery.

COMPLETE ORIGINAL-SITE RECORD

Egypt Branch: every published text contribution.

The complete page-specific narrative from the former RRSC website is preserved below in source order and divided into readable chapters. Source snapshot: 2026-08-25.
01 / SOURCE RECORD

The Rob Rockefeller S.C. Egypt Branch

The Rob Rockefeller S.C. – Cairo, Egypt 🇪🇬

We are pleased to announce the upcoming opening of our new Branch and AI Center dedicated to Sustainability Projects in the industrial engineering, mechanical, steel, medical, infrastructure, and robotics sectors.

This branch will operate in strategic cooperation with our Tunisia Branch, under the direction of our Executive Vice President and majority shareholder Valentino Loforese and the support of our CEO in Tunisia, Lassaad Kedimi and our China Branch CEO Xiaoli Kong

The branch will be established in collaboration with a highly important semi-governmental local partner, ensuring strong institutional alignment and long-term strategic cooperation within Egypt’s industrial and sustainability ecosystem.

02 / SOURCE RECORD

The Egyptian Center will be fully operational from January 2026, and development activities are already underway.

Further details will be officially released in November 2025.

STATUS & MILESTONES

What is established, published and still in development.

01

Operational New Cairo engineering center

02

Commercial branch structure remains in preparation

03

Regional cooperation with Tunisia

VIDEO & OFFICIAL DOCUMENTS

The complete source record.

Official videos, documents and professional profiles remain available after the photographic narrative and page content.
Official documents & profiles3 page-specific resources

AFRICA NETWORK

Move directly between independent country homes.

Every card opens the selected Branch Home directly—there is no intermediate page or second button to click.

R. ROCKEFELLER S.C. · EGYPT

This is the independent home of the Egypt Branch profile.

All branches